Wishlist¶
These are the things that we wish were fixed in rough order of priority.
Autofocus setup and calibration¶
Fix the autofocus and filter offsets.
Verify repeatability and integration with ACP/MaxIm/PWI.
Safety Systems¶
Integrate the UPS with the dome controller so the dome closes automatically on power loss.
Replace and test the rain/moisture sensor on the outside of the dome.
Weather and Sky Monitoring¶
Fix weather station threshold parameters
Install and configure the all-sky camera for periodic sky imaging.
Install seeing monitor
Park Position Shutdown Errors¶
Contact Bob Denny and/or Ash to allow the scope to point below the “horizon”
Fix horizontal park position during observatory shutdown.
Mount and Dome Maintenance¶
Research Astro-Physics maintenance recommendations.
Inspect and perform light maintenance as appropriate.
Investigate Ash Dome recommended maintenance procedures.
Develop a maintenance checklist and schedule.
Upgrades to Observatory Manual¶
Improve the workflow for editing and publishing the Sphinx-based manual.
Create a troubleshooting/FAQ section for common problems and fixes.
Add a form for updating the troubleshooting/FAQ.